Project divided into LOT 1 and LOT 2 – construction of a new road and reconstruction of an existing state road

The road belongs to the Moravica District, located in the central region of Serbia. Gornji Milanovac bypass is divided into two LOTs.

The newly designed LOT 1 section connects the Ibar Highway with Klatičevo and also forms part of the Gornji Milanovac bypass. The total length of this section is 4.78 km. It starts at a new roundabout in Gornji Milanovac and formally ends at the roundabout in Klatičevo.

LOT 2 involves the complete reconstruction of the existing State Road II A No. 177, connecting the roundabout in Klatičevo with the grade-separated interchange on the “Miloš Veliki” motorway in Takovo. The total length of this section is 4.70 km.

With the construction of this bypass, transit traffic towards the Miloš Veliki motorway is fully separated from local traffic.

Construction works include:

  • Total road surface area: 74,094 m²
  • Total length (LOT-1 and LOT-2): 9.7 km
  • Number of roundabouts: 2
  • Number of grade-separated intersections: 1
  • Number of at-grade intersections: 2
  • Number of bridge structures: 4
  • Number of relocated electrical lines: 20
  • Number of landslide rehabilitations: 5
  • Number of reinforced concrete retaining walls: 11 (898 m)
  • Number of reinforced earth structures: 2

Key quantities:

  • Bulk excavation: 281,226 m³
  • Embankment construction: 129,932 m³
  • Crushed stone layers: 90,727 m³
  • Reinforcement installed: 2,008 t
  • Bored piles: 3,434 m
  • Asphalt installed: 26,056 t
  • Concrete installed: 26,000 m³
  • Relocated telecommunications installations: 14.5 km