Metro Line 1 – Phase 1

First phase of Belgrade Metro Line 1 construction

Within the first phase of Belgrade Metro Line 1 construction, 15 metro stations and 10 ventilation and evacuation shafts are planned.

The first two stations at Makiško polje (Železnik and Makiš) are designed as surface stations, while all other structures will be located underground.

The scope of works of the Mostogradnja ING and Millennium Team consortium includes:

  • section of the metro at ground level,
  • open-cut method Type 2 (251 m),
  • MS Železnik,
  • MS Makiš,
  • MS Bele vode,
  • Shaft 02 Makiš brdo,
  • MS Trgovačka,
  • Shaft 03 Trebevićka,
  • MS Požeška,
  • MS Park Banovo Brdo,
  • Shaft 04 Stara šećerana,
  • MS Ada Ciganlija,
  • Shaft 05 Most na Adi,
  • Shaft 06 Sajam,
  • tunnel section (TBM): Bele vode – Sajam.

At the Bele vode station area, construction of a camp for the contractor, engineers, and subcontractors is planned, along with a segment production plant.